| Contract - Trinity Science Park, Cambridge |
| Client - SDC Special Projects |
| Contract Period - Ongoing |
| Value - £200,000 |
| |
| Contract Description - |
| The contract involves adding an extension to an existing portal frame building in Cambridge. The foundations are reinforced concrete ground beams on piles. The floors are a combination of block and beam and ground bearing reinforced concrete slab. The upper floors poured by Aden are on metal deck with reinforcing bars throughout their length. The drainage is both gravity fed and pumped. An attenuation tank has been installed to release water into the system at a reduced rate. |
|
Click here to download this project in PDF format |
 |
|
|