| |
 |
 |
 |
 |
| |
| Contract- McDonalds – Various Sites |
| Client- McDonalds Restaurants Ltd |
| Contract Period - Typical Duration -2 weeks per location |
| |
| Contract Description- |
• Design and construct surface water drainage systems.
• Repair as required. Supply and lay new paving.
• Lift and relay existing paving as required. Renewal and repair of kerb.
• Resurfacing works to entire car park areas. |
 |
|
|