Project Description
The contract involved the building of 7 luxury homes in Harpenden. A new sub-station was built and an adoptable crossover constructed to allow access to the new development. A combination of resin bonde tarmac and permeable block paved roads are to be constructed using no dig techniques. The houses are traditional beam and block on mass pour foundation with claymaster to sides of excavation. We have also constructed a 2.5m high boundary wall faced on both elevations.
Architect
Jarvis Homes Limited
Unit 1 Waterside
Station Road
Harpenden
AL5 4US
T: 01582 761211
F: 01582 764100
Engineer
PRC Structural Engineering Services
Suite 213 Spirella Building
Bridge Road
Letchworth
Herts
SG6 4ET
T: 01462 476470
F: 01462 476472
Contract
Sauncey Avenue
Harpenden
Client
Jarvis Homes Limited
Contract Period
30 Weeks
Value
£600,000