A little about us

Groundworks & Civil Engineering

Aden Contracting Ltd was founded in 2007 by Directors Adam Webster & Denis Curtis, merging together over 40 years experience within the Construction industry.

As a comprehensive Bedfordshire based Groundwork & Civil Engineering contractors, Aden Contracting specialise in, but are not limited to, works within the Commercial, Railway and Local Authority sectors.

It is our intent to work in partnership with our clients to ensure that their projects are undertaken to their specifications, whilst ensuring that workplaces are kept safe by meeting all of the required regulations.

We offer a complete package providing Labour, Plant and Materials for each project and pride ourselves on offering outstanding value for money whilst ensuring quality is not effected and timescales set by our clients are achieved.

Find out more

Our range of Services

Excavation

Bulk excavation & ground modelling.

Demolition

Removal of underground obstructions.

Drainage

Storm & foul drainage, attenuation systems & connections to existing deep drainage.

Concrete & Foundations

Pile foundations, mass fill & reinforced raft slabs.

Paving, Kerb & Blockwork

Block & slab paving works with associated kerbs & edgings.

Macadam & Tarmac

Service trench reinstatements, 278 works, car parks & pedestrian areas.

Formwork

Retaining walls, concrete structures, reinforced foundations & ground floor slabs.

Infrastructure

Access roads & new site entrances.

Reinforcement

Foundation slabs & reinforced concrete structures.

Setting Out

All engineering & setting out carried out in house by qualified engineers.

Soft Landscaping

Ground modelling & top soiling.

Storm Attenuation

Attenuation tanks, balancing ponds & headwalls to existing water courses.

Our Portfolio of Completed Projects

Educational

Bedford School

This project was for the construction of 7 new modular school buildings and associated hard and soft landscaped areas, including new fire access roads and parking area upgrades. read more

Road & Rail

Banbury Maintenance Station

Construction of a new light maintenance depot and associated sidings, approximately 500m South of Banbury Main Line Station. read more

Road & Rail

Northampton Station

Northampton Railway Station works consisted of ground beams and pads, retaining walls, lift pits, drainage and attenuation tanks as well as platform works and a substantial external package. read more

What They Say